The walls for this bio-retention basin were slip-formed without any reinforcing steel. Immediately after the construction and before any backfill was placed, CFRP was considered as a way to make up for the tensile strength of the missing rebar. Backfill and the other construction activities around the basin continued without the addition of the CFRP. Then, a few years later after the wall had cracked and started to move, United Structural Systems Bruce Harborth was called